Deformation monitoring and security-stability analysis for tailings pond starter dam with sectional construction

机译:尾矿池塘启动坝与截面结构的变形监测与安全稳定性分析

获取原文

摘要

The starter dam of a tailings pond, adopted sectional construction, might cause differential settlement, which will bring bad impact on the dam stability during use later.First, the deformation rate of starter dam was monitored by INSAR technology for 14 hours, which demonstrated that the nonuniform deformation rate was within the permissible security range.Secondly, by means of numerical calculation, simulating the real conditions of sequence of sectional construction, studying the distribution and the change relationship of the starter dam deformation along with the construction steps, it was concluded that the numerical calculation results mostly coincided with the monitoring results on both the whole settlement and uneven settlement distribution of the starter dam.At last, considering the real situation of tailings pond in the later use, the stability of the starter dam was analyzed under the fluid-structure interaction.The results show that the starter dam could remain stable during construction and later use.
机译:尾矿池塘采用截面结构,可能会导致差动结算,这可能会对在使用期间对大坝稳定性的差异。首先,由INSAR技术监测起动器的变形率14小时,这表明了这一点非均匀变形速率在允许的安全范围内。通过数值计算,模拟截面结构顺序的真实条件,研究了起动坝变形的分布和变化关系以及施工步骤,结束了该数值计算结果大多是对整个结算和起动dam.At的不均匀沉降分布最后,两人都在监测结果相吻合,考虑到尾矿库在以后使用的实际情况,启动大坝的稳定性下的分析流体结构相互作用。结果表明,起动器坝可以保持稳定的DURI NG施工及以后使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号