首页> 外文会议>International Conference on Recent Advances in Engineering Computational Sciences >Simulation and Optimization of Blackstart Restoration Plan in Bhutan using DIgSILENT
【24h】

Simulation and Optimization of Blackstart Restoration Plan in Bhutan using DIgSILENT

机译:使用Digsilent的Buhtant恢复计划的模拟与优化

获取原文

摘要

Blackouts in Power system are rare in occurrence. However, it is very important to have plans and systems in place to handle any eventuality even if it is remote. After any power blackout, it is necessary to bring power back to normalcy as quickly and reliably as possible. An effective system restoration plan reduces the impact of an outage on customers and on the economy of the affected area while reducing the probability of damage to equipment. This paper deals with the initial restoration process and the concept of bottom up approach of restoration is presented. Simulations are carried out on a test network with hydropower plant developed in DIgSILENT PowerFactory. The simulations mainly focus on parameters such as load pick up, system frequency and voltage and its effects on the load size, time and distance. Using these analyses, a set of guidelines is formulated for a safe and efficient blackstart procedure of a system.
机译:电力系统的停电是罕见的。但是,即使它是遥控器,有计划和系统在适当地处理任何可能性是非常重要的。在任何电源停电之后,必须尽可能快速可靠地将电力恢复到正常。有效的系统恢复计划减少了中断对客户和受影响地区经济的影响,同时降低了设备损坏的可能性。本文介绍了初始恢复过程,并提出了恢复自下而上的概念。在Digsilent PowerFactory开发的水电站测试网络上进行了模拟。模拟主要关注负载拾取,系统频率和电压等参数,以及对负载大小,时间和距离的影响。使用这些分析,配制了一组指南,用于系统的安全有效的Blackstart程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号