首页> 外文会议>International Conference on Education, Management and Computing Technology >Research on reasonable injection-production ratio of water flooding in the high water cut stage of Lamadian oil field
【24h】

Research on reasonable injection-production ratio of water flooding in the high water cut stage of Lamadian oil field

机译:兰迪安油田高水平阶段水利灌溉液体采用注射率的研究

获取原文

摘要

Lamadian oilfield has developed since the year 1973, which has passed a number of large-scale adjustment. It has come multiple sets of layers and sets of well pattern development pattern, injection-production relationship is complex and ineffective circulation. Therefore, It is necessary to study the reasonable injection-production ratio of water flooding in ultra high water cut stage. Under the premise of ensuring the layer energy, increase the utilization rate of water injection. In this paper, the material balance method is selected according to the actual development characteristics of oil field, The relationship between the liquid yield, water injection quantity and formation pressure is studied, to make clear the scale of reasonable production, calculation and reasonable prediction of injection production ratio, to provide the basis for the planning and regulation of water flooding in oil field.
机译:拉米迪亚油田自1973年以来一直发,已通过了一些大规模调整。 它来了多组层和井模式开发模式,注射生产关系复杂,循环无效。 因此,有必要研究超高水切口中的水淹水的合理注射生产比。 在确保层能量的前提下,提高注水的利用率。 本文根据油田的实际开发特性选择了材料平衡方法,研究了液体产量,注水量和形成压力之间的关系,明确了合理的生产,计算和合理预测的规模 注射生产比率,为油田水淹水的规划和调节提供依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号