A study on Influence of CCPM+ Parameters on Project Scheduling

机译:CCPM +参数对项目调度影响的研究

获取原文

摘要

To tackle problems in traditional project system, CCPM (Critical Chain Project Management) was introduced by Goldratt (1997) to identify both task dependence and resource conflicts as main constraints within a project [1]. In this paper, Critical Chain software CCPM+ is utilized to automate the Critical Chain planning process on an example project, from which more in-depth discussions are made based on computerized simulation process by CCPM+. It includes the investigation on the influence of different parameter values on project duration and buffer sizing.
机译:为了解决传统项目系统中的问题,CCPM(关键链项目管理)由Goldratt(1997)引入,以确定任务依赖性和资源冲突作为项目中的主要约束[1]。在本文中,利用关键链软件CCPM +在示例项目中自动化关键链规划过程,从中通过CCPM +基于计算机化模拟过程进行更多的深入讨论。它包括对不同参数值对项目持续时间和缓冲尺寸的影响的调查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号