首页> 外文会议>Fibre Value Chain Conference Expo >Case Study: Dissolving pulp mill expansion at a brownfield site
【24h】

Case Study: Dissolving pulp mill expansion at a brownfield site

机译:案例研究:在Brownfield遗址上溶解纸浆轧机膨胀

获取原文

摘要

This paper, led by Andrew Hall, is a case study for the engineering and commissioning and startup of a new brownfield dissolving pulp mill expansion. AMEC undertook EPCM delivery of the dissolving pulp mill expansion project in an integrated team of client, engineer and construction contractor working closely and collaboratively. The complex project involved the integration of a new fibreline, and reconfiguration of an existing fibreline, and upgrades to the recovery boiler, evaporators, recausticising, uptake machine, and a new woodyard and ash leaching plant.
机译:这篇论文由安德鲁霍尔领导,是一个案例研究新的棕片溶解纸浆磨削型纸浆厂的工程和调试和启动。 AMEC在综合和协作,在综合的客户,工程师和建筑承包商中进行了EPCM交付了溶解的纸浆厂扩展项目。该复杂项目涉及整合新的纤维线,并重新配置现有的纤维线,并升级到回收锅炉,蒸发器,压源,吸收机和新的伍德亚和灰浸植物。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号