首页> 外文会议>International Conference on Machine Tool Technology and Mechatronics Engineering >Evaluation of Power System Black-start Schemes Based on Improved DEA/AHP Evaluation Model
【24h】

Evaluation of Power System Black-start Schemes Based on Improved DEA/AHP Evaluation Model

机译:基于改进的DEA / AHP评估模型的电力系统黑色启动方案评估

获取原文

摘要

Aiming at multiple attribute in electric power system black start scheme evaluation, the characteristics of the subjective and objective weights are difficult to determine; Entropy weight method can not ensure independence; DEA model can't completely sorted and judgment matrix all of 1 problem may come up, this paper puts forward improved DEA/AHP model. According to the index of evaluation index focus type optimal selection, the worst plan to join the group evaluation schemes for evaluation. This method not only can guarantee the independence of the scheme can achieve full sort again, avoid the process of calculating the weight at the same time, to enhance the objectivity. The method is simple in calculation and reliable results, tianjin power grid black start scheme evaluation results prove the effectiveness of this method.
机译:针对电力系统的多个属性黑色开始方案评估,主体和客观重量的特征难以确定;熵权法不能确保独立; DEA模型不能完全排序,判断矩阵所有1个问题可能会出现,本文提出了改进的DEA / AHP模型。根据评估指标焦点型最佳选择的指标,加入群组评估方案进行评估的最糟糕的计划。这种方法不仅可以保证该方案的独立性可以再次实现全部,避免同时计算重量的过程,提高客观性。该方法在计算和可靠的结果中简单,天津电网黑色开始方案评估结果证明了这种方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号