首页> 外文会议>HydroVision Brazil Conference >Experience with Large Francis Rehabilitation Projects
【24h】

Experience with Large Francis Rehabilitation Projects

机译:大型弗朗西斯康复项目经验

获取原文

摘要

This paper presents the experience with some of these large projects where such improvements have been designed with CFD support, model tested and implemented on the full scale units, including the 2 different designs for the 10 x 770 MW Guri 2 plant, and the 353 MW Ruacana plant. Also, the Inga 2 case a hydraulic design & performance comparison between the old and rehab units will be provided, as the original design from the former Sulzer-Escher Wyss (now Andritz Hydro) has recently been upgraded. An outlook to the Inga 3 upcoming project is provided. Through the paper, limiting factors will be discussed, including CFD applications as well as methods for verification of mechanical integrity.
机译:本文介绍了一些这些大型项目中的一些经验,其中包括CFD支持,模型在全尺度单位上进行测试和实施,包括10 x 770 MW Guri 2植物的2种不同的设计,以及353兆瓦 Ruacana植物。 此外,INGA 2案例将提供旧和康复单位之间的液压设计和性能比较,因为前苏尔策斯科尔Wyss(现在Andritz Hydro)的原始设计已经升级。 提供了Inga 3即将到来的项目的前景。 通过本文,将讨论限制因素,包括CFD应用以及验证机械完整性的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号