The demands placed on Wind Farm Support Vessels (WFSVs), their crews and the people they carry in the operational environment presented by the latest round of offshore wind farms require the issues involved to be properly identified and appraised in order that operations are conducted safely so far as reasonably practicable. Many vessels currently operating (and which comprise the majority of craft available to the developer) would be at – or beyond - the limits of the vessels design and crew's capability in the more distant installations. TUV SUD PMSS personnel have considerable experience of offshore wind farm vessel operations and it has been noted that some significant issues can possibly be attributed to, amongst other things, manning levels, competence and human factors such as fatigue induced by both working time issues and to the workload involved in systems and equipment monitoring.
展开▼
机译:在最新一轮海上风电场上提出的风电场支持船只(WFSV),他们的船员和他们携带的人民的需求要求正确识别和评估所涉及的问题,以便安全地进行与合理切实可行一样。目前运营的许多船只(并且包括开发商提供的大多数工艺)将是 - 或超越 - 船只设计和船员在更遥远的安装中的能力的限制。 TUV SUD PMSS人员拥有近海风电场船舶运营的大量经验,并已注意到一些重要的问题可能归因于其他事情,曼宁水平,能力和人类因素,如工作时间问题所引起的疲劳等涉及系统和设备监控的工作量。
展开▼