Approach Methodologies and Candidate Applications for Repowering Existing Coal Fired Power Plant Unit Assets with Natural Gas Combustion Turbine Combined Cycle

机译:采用天然气燃烧涡轮机组联合循环重新推回现有燃煤电厂单元资产的方法和候选申请

获取原文

摘要

Electric power generation companies’ recent announcements to retire older coal based power plant units due to local and federal emission regulations and lower cost natural gas fuel source may need to consider repowering options in order to retain some value out of the existing retired units. The power plant owner will need to consider use of the existing power plant assets to lower the cost of a new generation unit. Several factors will need to be reviewed for a successful repowering project, but due to the inherent benefit of an existing power facility will greatly improve the economics for new generation assist on a repowered brownfield site. Existing power facility will typically include power transmission, existing air permit, water supply availability; treated water NPDES discharge permit, existing infrastructure systems and equipment, and experienced labor as key attributes for a repowering project. A repowering project will need to review requirements for new electrical output, performance requirements, transmission constraints, existing unit steam turbine generator capabilities, site layout restrictions and existing facility infrastructure that can be reused to support the new generating asset and overall cost of the repowering project compared to the cost of a new stand alone power unit. This paper will provide repowering candidate facility considerations and an approach to identify and execute successful repowering projects
机译:电力发电公司最近的公告退出旧的煤炭电厂单位由于本地和联邦排放法规和较低的成本天然气燃料源可能需要考虑重新交易所选项,以便在现有的退休单位中保留一些价值。电厂所有者需要考虑使用现有的电厂资产来降低新一代单位的成本。需要审查一个成功的重新交力项目的几个因素,但由于现有电力设施的固有效益将大大改善重新交换棕地网站的新一代辅助经济学。现有电力设施通常包括电力传输,现有的空气许可,供水可用性;处理的水NPDES排放许可证,现有基础设施系统和设备,经验丰富的劳动力作为重新排斥项目的关键属性。重新交易所项目需要审查新电气输出,性能要求,传输限制,现有单元汽轮机发生器能力,站点布局限制和现有设施基础设施的要求,以支持新的发电资产和重新排斥项目的总体成本与新立场电源单元的成本相比。本文将提供重新交锋的候选设施考虑因素和识别和执行成功重新排斥权的方法

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号