首页> 外文会议>SPE Bergen One Day Seminar >Innovative Remediation Techniques for Restoring Well Integrity by Curing High Annulus-B Pressure and Zonal Communication
【24h】

Innovative Remediation Techniques for Restoring Well Integrity by Curing High Annulus-B Pressure and Zonal Communication

机译:通过固化高环-B压力和区间通信来恢复良好诚信的创新修复技术

获取原文

摘要

The petroleum industry has made significant investments and extensive research to rectify well integrity issues, one particular failure mode relates to the migration of hydrocarbon fluids to surface through microchannels, due to poor cementation, resulting in the inability to provide integral barriers in the 95/8" casing x 12" hole annulus. Section milling and external casing patches are two of the widely-utilized approaches to restore annulus integrity; however, they add complexity associated with excessive steel cuttings and re-entry risk. Remediation using Hydra System is one of the innovative approaches that can be utilized in wells to provide strong integral cement barriers behind the 95/8" production casing below the 133/8" casing-shoe to prevent reservoir fluids migrating to surface. As a consequence, the well life can be extended and the older wells can be restored back to production and injection. This approach is gaining increased popularity due to a number of economic and environmental advantages such as restoring the well production/injection with minimum workover costs and risk due to less complex operations. The research utilizes a novel technology to execute a repair of wells with failed Annulus-B (95/8" x 133/8" casing annulus barrier) integrity by providing integral cement barriers in Annulus-B above the reservoir for wells experiencing migration of hydrocarbons from reservoir through the this casing annulus. The planned methodology starts with completion recovery followed by running noise, temperature and cement bond logs in order to evaluate the cement quality behind 95/8" casing above the reservoir.
机译:石油工业已经取得了重大的投资和广泛的研究,以纠正井的完整性问题,一种特殊的故障模式涉及由于胶泥差,通过微通道迁移碳氢化合物流体通过微通道的表面迁移,导致在95/8中提供完全的障碍“套管x 12”孔环。铣削和外壳贴片部分是恢复环形完整性的两种广泛利用的方法;但是,它们增加了与过度钢扦插和重新入口风险相关的复杂性。使用HYDRA系统的修复是可在井中提供的创新方法之一,以在133/8“壳体下方的95/8”生产壳体后面的强大的整体水泥屏障,以防止迁移到表面的储层液体。因此,井生命可以延长,旧井可以恢复到生产和注射。由于许多经济和环境优势,这种方法越来越受欢迎,例如恢复良好的生产/注入,由于运营较差的运营较小的运营而导致的井生产/注塑。该研究利用一种新颖的技术通过在储存器上方的储层中高于经历碳氢化合物的井的储层中,通过在环Unulus-B中提供整体水泥屏障来执行具有失败的井的修复井(95/8“x 133/8”套管环壁屏障)完整性从水库通过这种套管环。计划的方法从完成恢复开始,然后运行噪声,温度和水泥键的日志,以便在储存器上方95/8“壳体后面的水泥质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号