首页> 外文会议>SPE International Conference on Health, Safety and Environment >Progressive Land Reclamation as the Design and Operational Basis for the Kearl Oil Sands Mine
【24h】

Progressive Land Reclamation as the Design and Operational Basis for the Kearl Oil Sands Mine

机译:逐步的土地填海填海作为Kearl油砂矿的设计和运营基础

获取原文

摘要

Development of the oil sands in northeastern Alberta is an important contributor to the economies of both Alberta and Canada, but this type of hydrocarbon resource is often perceived by some as representing daunting environmental challenges. One particular area of stakeholder focus is the nature of the surface land footprint associated with mineable oil sands developments. This paper will provide the facts and context of progressive reclamation in Canada’s mineable oil sands industry with a focus on the Kearl Oil Sands Mine operated by Imperial Oil Resources Ventures Limited (Imperial Oil). It will demonstrate how progressive land reclamation has been integrated into the mine planning process for Kearl from the outset of project planning and how the soil, overburden, groundwater, surface water, vegetation and wildlife resources are considered throughout the life of the mine from a reclamation perspective. Nearly 22,000 ha of land will be disturbed over 40+ years of operation of the Kearl Oil Sands Mine. Imperial Oil is committed to progressive reclamation of the disturbed land throughout the life of the mine. As part of Kearl’s long-term vision for reclamation success, Imperial Oil is currently salvaging, segregating and storing soil and collecting and banking native seeds so that these valuable reclamation materials are readily available in the future. Ongoing mine closure planning and the integration of progressive reclamation from the outset of the mine planning process has identified opportunities, vulnerabilities and technical constraints to mine closure.
机译:油砂中阿尔伯塔省东北部的发展是阿尔伯塔省和加拿大经济的重要因素,但这种类型的油气资源通常是由某些人视为代表令人生畏的环境挑战。利益相关者关注的一个特殊领域是可开采的油砂发展相关的土地表面足迹的性质。本文将提供在加拿大开采油砂行业的事实和渐进回收的情况下,重点放在了Kearl油砂矿山由帝国石油资源投资有限公司(帝国石油公司)操作。它将演示土地如何逐步回收已经从项目规划的一开始就融入了我的计划过程Kearl土,覆土,地下水,地表水,植被和野生动物资源是如何认为在整个矿山的寿命从回收看法。近2.2公顷的土地将在40多年的Kearl油砂矿山的运作受到干扰。帝国石油公司致力于不安土地复垦逐步在整个矿山的寿命。作为Kearl的复垦成功的长期愿景的一部分,帝国石油公司目前正在抢救,分离和储存土壤收集和银行原生的种子,使这些宝贵的回收材料在未来一应俱全。正在进行的矿井关闭计划和逐步复垦从矿山规划过程的一开始就整合已确定的机会,脆弱性和技术的限制,以矿山关闭。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号