首页> 外文会议>Taishan Academic Forum >The transport systems of simulation and optimization of Dingfeng's slime and gangue power plant
【24h】

The transport systems of simulation and optimization of Dingfeng's slime and gangue power plant

机译:鼎丰粘液和煤矸石发电厂仿真与优化的运输系统

获取原文

摘要

To solve the problem of transporting the slime and gangue which in the power plant at the long-distance, and improving the economic and environmental benefits, it plans to design the pipeline of slime and gangue. Under the premise of the feasibility, begin to implement and manage the transportation method of the pipeline. This paper describes the transportation methods and research status about slime and gangue, such as traditional or existing transport planning scheme. Comparing these programs to choose the best method under the guidance of maximize benefits, in order to solve the problem of material transportation from Suncun mine to the power plant. It provides an effective way to solve the issues of slime utilization and environmental protection and creates enormous social and economic benefits in the coal industry. Thus build coal - electricity - Fine coal industry chain, to promote the rapid development of new coal-fired power industry.
机译:解决在长距离电厂中运输粘液和煤矸石的问题,提高经济和环境效益,计划设计粘液和煤矸石的管道。在可行性的前提下,开始实施和管理管道的运输方式。本文介绍了关于粘液和煤矸石的运输方法和研究现状,如传统或现有的运输计划方案。比较这些计划在最大化福利的指导下选择最佳方法,以解决从Suncun Mine到电厂的材料运输问题。它提供了解决羊绒利用率和环境保护问题的有效方法,在煤炭行业中创造了巨大的社会和经济效益。从而建造煤炭 - 细煤产业链,促进新型燃煤电力行业的快速发展。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号