首页> 外文会议>Coiled Tubing Well Intervention Conference >Use and Placement of Resin Blends to Effectively Isolate Existing Perforations when Fracture Stimulated Productive Horizons are below Existing Perforations:A Case History from the Middle East
【24h】

Use and Placement of Resin Blends to Effectively Isolate Existing Perforations when Fracture Stimulated Productive Horizons are below Existing Perforations:A Case History from the Middle East

机译:使用和放置树脂混合物以有效地分离出现有的穿孔当骨折刺激的生产视野低于现有的穿孔时:中东的案例历史

获取原文

摘要

Hydraulic fracturing is the preferred method for enhancing production rates and hydrocarbon recovery,as well as for maximizing the productivity of conventional and unconventional reservoirs.To optimize the effectiveness of the treatment and maintain wellbore integrity,the stimulation process should be designed and executed with both the wellbore configuration and target formations in mind.For wells in which multiple fractures are required,stimulations are normally performed sequentially,from the bottom layer to the top layer;however,open perforations above the target zone(whether fractured or not)can present significant challenges during the stimulation process.For these cases,the preferable solution has been to isolate the perforations using the cement-squeeze technique,but this process is not completely effective because of short penetration.The fragility of the cement slurry under typical stress cycles associated with the fracturing process or the complexity of the process could compromise the existing perforation integrity and the effectiveness of fracturing the lower zone.Alternatively,the well can be recompleted to isolate the zone mechanically,though this involves a rig operation,which, in zoned areas,is not cost-effective. One effective method to isolate existing perforations and help ensure deeper penetration of the isolation system without pulling out of the completion is squeezing a resin-based system with sufficient plasticity to maintain the isolation integrity under normal stress cycles.This paper documents the first application of resin blends to isolate existing perforations for the fracture stimulation of deeper prospective horizons.This isolation and stimulation process follows these steps:(1)the resin blend is squeezed into the wellbore using coiled tubing(CT);(2)the remaining resin blend is cleaned up using CT and a pressure test is performed;(3)the deeper horizon is perforated;(4)a minifrac and temperature survey are performed to evaluate existing perforation isolation;and(5)the fracture stimulation and production evaluation are performed.
机译:液压压裂是提高生产率和碳氢化合物回收的优选方法,以及最大化常规和非传统水库的生产率。为了优化治疗的有效性并保持井眼完整性,应使用刺激过程进行设计和执行考虑到井筒配置和目标形成。对于需要多种裂缝的孔,通常从底层到顶层依次进行刺激;然而,在目标区域上方的开孔(无论是裂缝还是不)可能出现重大挑战在刺激过程中。对于这些情况,优选的解决方案是使用水泥挤压技术分离穿孔,但由于短暂的渗透性,该过程并不完全有效。水泥浆料下的典型应力循环脆弱的脆性压裂过程或过程的复杂性可以com承诺现有的穿孔完整性和压裂下部区域的有效性。可以重新完成井以机械地隔离区域,尽管这涉及钻机操作,在分区区域,不具有成本效益。一种有效的方法来隔离现有的穿孔,有助于确保隔离系统的更深渗透而不会拉出完成,挤压基于树脂的系统,具有足够的可塑性,以保持正常应力循环下的隔离完整性。本文的纸张文件是树脂的第一次应用混合以隔离现有的穿孔,用于骨折刺激更深的前景视野。遵循这些步骤:(1)使用卷绕管(CT)挤入井筒中的树脂共混物;(2)剩余的树脂混合物清洁使用CT和压力试验;(3)穿孔更深的地平线;(4)进行MINIFRAC和温度测量以评估现有的穿孔隔离;(5)进行骨折刺激和生产评估。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号