Integration of Pipeline Operations Sourced with CO2 Captured at a Coal-fired Power Plant and Injected for Geologic Storage: SECARB Phase III CCS Demonstration

机译:通过CO2捕获的二氧化碳排水管运营的集成,并注入地质储存:SECARB第III CCS示范

获取原文

摘要

This paper presents a case study of the design and operation of a fit-for-purpose pipeline sourced with "anthropogenic" carbon dioxide (CO2) associated with a large-scale carbon capture and storage (CCS) Research & Demonstration Program located in Alabama, USA. A 10.2 centimeter diameter pipeline stretches approximately 19 kilometers from the outlet of the CO2 capture facility, located at Alabama Power Company's James M. Barry 2,657-megawatt coal-fired electric generating plant, to the point of injection into a saline reservoir within Citronelle Dome. The CO2 pipeline has a 6.5 meter wide easement that primarily parallels an existing high-voltage electric transmission line in undulating terrain with upland timber, stream crossings, and approximately 61,000 square meters of various wetland types. In addition to wetlands, the route transects protected habitat of the Gopher Tortoise. Construction methods included horizontal drilling under utilities, wetlands, and tortoise habitat and 'open cutting' trenching where vegetation is removed and silt/storm-water management structures are employed to limit impacts to water quality and ecosystems. A total of 18 horizontal directional borings, approximately 8 kilometers, were used to avoid sensitive ecosystems, roads, and utilities. The project represents one of the first and the largest fully-integrated pulverized coal-fired CCS demonstration projects in the USA and provides a test bed of the operational reliability and risk management for future pipelines sourced with utility CO2 capture and compression operations sole-sourced to injection operations. An update on status of the project is presented, covering the permitting of the pipeline, risk analysis, design, construction, commissioning, and integration with compression at the capture plant and underground injection at the storage site.
机译:本文介绍了与位于阿拉巴马州的大规模碳捕获和储存(CCS)研究和示范计划相关的“人类学”二氧化碳(CO2)的适当型管道的设计和运行的案例研究。美国。 10.2厘米直径的管道距离二氧化碳捕获设施的出口大约19公里,位于阿拉巴马州电力公司的詹姆斯M. Barry 2,657-Megawatt燃煤发电厂,以注射到Citronelle圆顶内的盐水库。 CO2管道具有6.5米宽的地役机,主要在带有普满木材,流线和各种湿地类型的大约61,000平方米的波状地形中平衡现有的高压电力传输线。除了湿地,路线还横断了粪龟的受保护的栖息地。施工方法包括在公用事业,湿地和乌龟栖息地下的水平钻井,并“开放式切割”挖沟,植被被移除,淤泥/雨水管理结构被用来限制水质和生态系统的影响。共使用18个水平方向钻,大约8公里,用于避免敏感的生态系统,道路和公用事业。该项目代表了美国第一和最大的全面粉煤燃煤CCS示范项目之一,并为未来管道提供的运营可靠性和风险管理提供了试验床,其利用实用二氧化碳捕获和压缩操作鞋底注射操作。提出了一个关于项目状态的更新,涵盖了捕获工厂和存储站点的捕获工厂和地下注射压缩管道,风险分析,设计,施工,调试和集成的允许。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号