首页> 外文会议>International Conference on Greenhouse Gas Technologies >Dynamic modeling and validation of post-combustion CO2 capture plants in Australian coal-fired power stations
【24h】

Dynamic modeling and validation of post-combustion CO2 capture plants in Australian coal-fired power stations

机译:澳大利亚燃煤电站燃烧二氧化碳捕获工厂的动态建模与验证

获取原文

摘要

Flexible operation of post-combustion CO2 capture (PCC) plants can improve efficiency through coordinating the balance between consumer demands for electricity and CO2 emission reductions. This strategy however, will impose process disturbances while the PCC plant is ramped up, ramped down or turned off. This paper presents the preliminary development of a dynamic model for PCC in a brown coal-fired power plant using the process simulation software Aspen Plus Dynamics. Validation of the dynamic model will be against both steady state and dynamic data from the pilot plant. By gaining this understanding of the dynamic behavior, the technical and financial performance of PCC can be optimised.
机译:燃烧后CO2捕获(PCC)工厂的灵活操作可以通过协调消费者对电力和二氧化碳排放减少的需求之间的平衡来提高效率。然而,这种策略将施加过程干扰,而PCC工厂升高,则升压或关闭。本文介绍了使用流程仿真软件Aspen Plus Dynamics在棕色燃煤电厂PCC动态模型的初步开发。动态模型的验证将反对导频工厂的稳态和动态数据。通过获得对动态行为的理解,可以优化PCC的技术和财务性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号