首页> 外文会议>SPE Western North American and Rocky Mountain Joint Meeting >Proppants Selection Based on Field Case Studies of Well Production Performance in the Bakken Shale Play
【24h】

Proppants Selection Based on Field Case Studies of Well Production Performance in the Bakken Shale Play

机译:基于现场案例研究的Proppants选择Bakken Shale Play的井生产性能

获取原文

摘要

A brief overview of different proppant types and amounts used in stimulation designs in the Bakken shale play since 2011 is presented in this paper.The primary goal of the paper is to determine the long-term production and economical effectiveness on hydraulically fractured wells using different proppant types,percentages of proppant types and overall amount of proppant in the well completions.The results are based on four case studies that focus on 72 wells in four different fields in the Bakken formation of the Williston Basin. In these four case studies,the primary variable that affects the difference in long-term production of the different well groups is the percentage and amount of each proppant type used in the completion design.Completion and stimulation data was collected from public resources such as the North Dakota Industrial Commission(NDIC)database.In each case study,wells in the same field were grouped.For each group of wells,the average long-term production and economical effectiveness was analyzed. The case studies in the Capa Field in Williams County North Dakota and the Chimney Butte Field in Dunn County North Dakota shows that over a 270 day period,in each group of wells completed with about 30 percent ceramic proppant mixed with silica sand,the wells produced an average of over 100 percent more than the comparable group of wells completed using only silica sand.The case study in the East Fork Field in Williams County North Dakota shows that after 270 days of production,the group of wells using 100 percent ceramic proppant attained an average of 27 percent production increase over the group of wells using an average of 62 percent ceramic proppant.These wells also attained a 67 percent production increase over the group of wells using an average of 35 percent ceramic proppant. In comparing completion procedures in these high-producing fields,using a combination of high percentages and large amounts of ceramic proppant has yield higher production and EUR.The use of ceramic proppant not only covers the additional proppant cost in a short period of time,but also generates higher revenue in the long term.The findings from these case studies should apply to all fields that have similar reservoir characteristics.
机译:本文提出了自2011年以来Bakken Shale Play的不同支撑剂类型和金额的简要概述。本文的主要目标是使用不同的支撑剂确定液压骨折井上的长期生产和经济效果类型,井完井中的支撑剂类型和总支撑剂的总体百分比。结果基于四个案例研究,重点关注威尔斯顿盆地Bakken形成的四种不同领域的72孔。在这四个案例研究中,影响不同井组长期产量差异的主要变量是完成设计中使用的每个支撑剂类型的百分比和数量。从公共资源中收集了诸如公共资源的刺激数据。北达科他州工业委员会(NDIC)数据库。在每种案例研究中,同一领域的井被分组。对于每组井,分析了平均的长期产量和经济效果。在威廉姆斯县北达科他县的Capa领域的案例研究南达科他州南达科他州的烟囱巴特场显示,在每组井中完成了270天的井中,井与硅砂混合了大约30%的陶瓷支撑剂平均超过100%的比较超过硅砂的可比较孔。威廉姆斯县东叉田的案例研究北达科他认为,在生产270天后,井中的井组使用了100%的陶瓷支撑剂达到了使用平均62%的陶瓷支撑剂,平均井的平均生产井的27%增加。使用平均35%的陶瓷支撑剂,这些孔也达到了67%的井中的产量增加。在比较这些高产物领域的完成程序时,使用高百分比和大量陶瓷支撑剂的组合产生更高的生产和EUR。使用陶瓷支撑剂的使用不仅在短时间内涵盖了额外的支撑性成本,但是在长期内也产生更高的收入。来自这些案例研究的发现应该适用于具有类似储层特征的所有领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号