首页> 外文会议>Hydrovision International Conference and Exhibition >International Financing Options and Policies: Challenges to U.S. Hydro Development (PPT)
【24h】

International Financing Options and Policies: Challenges to U.S. Hydro Development (PPT)

机译:国际融资方案和政策:对美国水电发展的挑战(PPT)

获取原文

摘要

1 Largest hydropower producers: 1.1 China: 249 GW of installed capacity 1.2 Brazil: 83 GW of installed capacity 1.3 Canada: 75 GW of installed capacity 2 According to the World Energy Council, global hydropower installed capacity is 1.31 TW. 3 Of this, approximately 516 MW is installed tidal and ocean hydropower projects. 4 According to the International Hydropower Association, investment in hydropower projects is becoming increasing global with foreign investors exploring new regions.
机译:1个最大的水电生产商:1.1中国:249 GW装机容量1.2巴西:83 GW装机容量1.3加拿大:75 GW装机容量2根据世界能源委员会,全球水电装机容量为1.31 TW。 其中3个,大约516兆瓦安装了潮汐和海洋水电项目。 4根据国际水电协会,水电项目的投资正在越来越多的外国投资者探索新地区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号