首页> 外文会议>SPE Energy Conference 2014 >From Screening to Drilling – Planning a Drilling Campaign in an Offshore Mature Field: A Case Study of TSP Field, East Coast Trinidad
【24h】

From Screening to Drilling – Planning a Drilling Campaign in an Offshore Mature Field: A Case Study of TSP Field, East Coast Trinidad

机译:从筛选到钻井 - 规划近海成熟田野的钻探运动:以东海岸特立尼达特TSP字段为例

获取原文

摘要

Repsol (operator), together with partners Petrotrin and National Gas Company of Trinidad and Tobago, took over operations of mature fields Teak, Samaan and Poui (TSP) Offshore Trinidad at the end of 2005. With the intention of planning further development in the TSP reservoirs (comprising more than 10 vertically stacked main units, highly compartmentalized reservoirs with complex tectonic geometries) an indigenous comprehensive field evaluation was required. Thus, a sand-by-sand Screening Project was carried out with the main objective of identifying the reservoirs with maximum potential so as to direct further technical effort on specific reservoirs for early monetization of reserves. Based on the results of the sand-by-sand screening project, a prospect validation project for Teak Field was initiated – consisting of extensive field data acquisition, detailed interpretation and modeling workflows, adapted to the particular needs of mature fields. Several incremental opportunities identified during screening were validated and detailed modeling was performed to support further development. On completion of this effort, the company acquired a holistic view of the asset in terms of projects and its remaining resources, so a drilling campaign was envisioned and planning started. The selection of drilling candidates was not a straight forward process. The number of opportunities had been reduced considerably from the opportunity category to the actual well candidates. Several disciplines developed specific workflows to overcome the challenges, for example: risk assessment for infill opportunities and probabilistic forecasting (Subsurface), trajectory designs including anti-collision, drilling through depleted sands, torque and drag analysis and selecting a suitable rig for the field and production platform conditions (Drilling Engineering); among others. At the time of submitting this paper, two drilling rigs are moving onto the acreage to start drilling these opportunities by the end of 2013. This paper outlines the different challenges faced, as well as case studies of the evolution and maturation from the screening to the drilling stage of some of the prospects.
机译:雷普索尔(运营商),与合作伙伴Petrotrin和特立尼达和多巴哥国家天然气公司一起,接手成熟油田的柚木,Samaan和Poui(TSP)海上特立尼达的操作在2005年底随着在TSP计划进一步发展的意向储存器(包括超过10个垂直堆叠的主单元,具有复杂构造几何形状的高度分区化储存器)需要土着综合场地评估。因此,进行了一个砂砂筛分项目,主要目的是识别具有最大潜力的储层,以便在特定水库上引进进一步的技术努力,以便预留储备的早期货币化。根据砂砂筛选项目的结果,启动了柚木场的前景验证项目 - 由广泛的现场数据采集,详细解释和建模工作流组成,适应了成熟领域的特定需求。验证了筛选期间识别的几种增量机会,并进行了详细的建模以支持进一步的发展。完成这项努力,该公司在项目和其余资源方面获得了资产的整体景观,因此设想了钻探活动并计划开始。钻井候选人的选择不是直接的前进过程。从机会类别到实际候选人的机会,机会的数量很大。几个学科开发了特定的工作流程,以克服挑战,例如:填写机会的风险评估和概率预测(地表),轨迹设计,包括防碰撞,通过耗尽的砂,扭矩和拖曳分析钻孔,并为该领域选择合适的钻机生产平台条件(钻井工程);其中。在提交本文时,两台钻井钻机正在进入面积,以便在2013年底开始钻探这些机会。本文概述了面临的不同挑战,以及从筛查中的进化和成熟的案例研究一些前景的钻井阶段。

著录项