首页> 外文会议>Offshore Technology Conference Asia >Single-Trip Multizone Gravel-Packing Case History Improves Anticipated Production from the Berantai Field
【24h】

Single-Trip Multizone Gravel-Packing Case History Improves Anticipated Production from the Berantai Field

机译:单行程多墨砾石包装案例历史改善了Berantai领域的预期生产

获取原文

摘要

The Berantai Field is a marginal sand-prone formation located offshore in the Malaysian Peninsula,and its development was chosen for Malaysia’s first Risk Service Contracts(RSCs). A key performance requirement was to complete and produce the gas wells,sand free at a certain target production rate. However,during development of the field,up to twenty multilayered,unconsolidated sand formations that had not been considered in the FDP were discovered,increasing the challenges for the completion strategy. The dual-string single-trip multi zone(STMZ)system was selected for the completions,as this technology had been proven to provide cost-effective,single-trip gravel-pack applications that could reduce overall cost,since the gravel packing for multiple zones could be performed in a single trip.Although completing long intervals has unique challenges for fixed- interval spacing,and the initial campaign presented other challenges,the completion plan developed by the operator and service company enabled all seven wells to be successfully delivered.A total of thirty-one zones were treated.One of the wells not only had six gravel-packed zones installed in one trip,but it also had the world’s longest concentric wash pipe used to date in any dual-string STMZ completion. This paper will show how proper completion planning and dual-string STMZ technology enabled the operator to deliver the committed gas production,saved~150K USD per gravel-packed zone,and reduced approximately 2.67 days in average rig time per well.The challenges addressed during this campaign,the methodology followed in the completion design,the detailed completion and pumping strategy success factors,and the production results obtained from this marginal field development will be presented.
机译:该Berantai油田是一个边际砂容易形成位于离岸在马来西亚半岛,并选择了马来西亚的第一个风险服务合同(RSCS)的发展。一个关键的性能要求是完成生产气井,无砂在一定的目标生产速度。然而,该领域,高达发展到二十多层的过程中,那些没有在FDP被认为是疏松砂岩地层中被发现,增加了完成战略的挑战。选择了双串行程单多区域(STMZ)系统用于完井,因为这种技术已经被证明可以提供具有成本效益,行程单,可以降低整体成本砾石充填应用,因为多砾石充填区可以在一个单一的trip.Although完成长间隔进行对定点区间间距独特的挑战,最初的活动提出的其他挑战,运营商和服务公司开发完成计划使所有七口井是成功delivered.A共有31区不仅安装了一个行程6砾石充填区井treated.One,但它也有迄今使用任何双串STMZ完成世界上最长的同心洗管。本文将展示正确完成规划和双串STMZ技术如何使运营商为客户提供承诺的天然气生产,节约每砾石充填区〜150K美元,平均钻井时间大约2.67天减少每个well.The挑战过程中解决这项运动所遵循的方法在完成设计,详细的完成和抽水战略的成功因素,并从这个边际油田开发中获得的生产结果将提交。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号