首页> 外文会议>International Particle Accelerator Conference >ACCELERATOR SYSTEMS MODIFICATIONS FOR A SECOND TARGET STATION AT THE OAK RIDGE SPALLATION NEUTRON SOURCE
【24h】

ACCELERATOR SYSTEMS MODIFICATIONS FOR A SECOND TARGET STATION AT THE OAK RIDGE SPALLATION NEUTRON SOURCE

机译:加速器系统对橡木脊型倒立中子源的第二个目标站进行修改

获取原文

摘要

A second target station is planned for the Oak Ridge Spallation Neutron Source. The ion source will be upgraded to increase the peak current from 38 to 49 mA, additional superconducting RF cavities will be added to the linac to increase the H~- beam energy from 938 to 1300 MeV, and the accumulator ring will receive modifications to the injection and extraction systems to accommodate the higher beam energy. After pulse compression in the storage ring one sixth of the beam pulses (10 out of 60 Hz) will be diverted to the second target by kicker and septum magnets added to the existing Ring to Target Beam Transport (RTBT) line. No further modifications will be made to the RTBT so that when the kicker and septum magnets are turned off the original beam transport lattice will be unaffected. In this paper we will discuss these and other planned modifications and upgrades to the accelerator facility.
机译:计划用于橡木脊型剥落中子源的第二目标站。离子源将升级以增加38至49 mA的峰值电流,额外的超导RF腔将被添加到LINAC中,从938到1300 mev增加H〜梁能量,并且蓄能器环将接收对其的修改注射和提取系统以适应更高的光束能量。在存储环中的脉冲压缩之后,通过向现有环添加到目标光束传输(RTBT)线的脊椎和隔膜磁体将梁脉冲的脉冲脉冲(10个超出)的脉冲压缩(10个超出)转移到第二靶。没有进一步的修改将对RTBT进行,以便当踢脚器和隔膜磁体关闭时,原始光束传输格子将不受影响。在本文中,我们将讨论这些和其他计划的修改和升级到加速器设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号