Recent catastrophic failures of tailings dams highlight the relevance of a proper governance framework for tailings storage facilities (TSF's) to ensure the implementation and verification of controls, in order to minimize risk over the full life of the facility. In this regard, construction is recognized as a progressive process during the life cycle of most TSF's, requiring robust management of controls to assure tailings dam safety.This article presents the construction quality assurance (CQA) developed during the first phase of Los Diques TSF1, focusing on the role of the Engineer of Record onsite (EoR onsite) as a part of the governance framework established by the Owner. It also addresses its relevance for the effective CQA of an Owner self-perform (OSP) tailings rockfill dam, using mine waste rock directly from the Candelaria open pit.In effect, the OSP construction allowed to increase the efficiency and to reduce the footprint of the project. In addition, the role of the EoR onsite described in this article, proved to be a key part of the success of this construction scheme, fulfilling the approved design requirements and permit commitments related to the tailings dam.Los Diques downstream constructed rockfill dam design considers a maximum final height of 160 m (first construction phase of 60 m height) and a total tailings storage capacity of approximately 600 Mt (up to 75 ktpd of whole tailings deposited with a solid concentration by weight about 50%).
机译:尾矿坝近期灾难性的失败凸显恰当的治理框架,对尾矿贮存设施的相关性(TSF的),以确保控件的实现和验证,以尽量减少在设施的整个生命危险。在这方面,建设最TSF的生命周期期间确认为一个渐进的过程,需要的控制强大的管理,以确保尾矿坝safety.This文章介绍了在洛杉矶Diques TSF1的第一阶段开发施工质量保证(CQA)重点记录的现场(EOR现场)由业主制定的治理框架的一部分,工程师的作用。它还涉及其为业主自执行(OSP)尾矿堆石坝的有效CQA相关性,直接利用矿山废石从坎德拉里亚开放pit.In效果,OSP施工允许提高效率和降低的足迹该项目。另外,提高采收率的作用现场这篇文章,证明该施工方案成功的一个关键部分中描述,履行相关的尾矿dam.Los Diques下游构建堆石坝设计考虑批准的设计要求和许可证承诺为160μm(60米高度的第一结构相)和大约600万吨的总尾矿存储容量(高达75 ktpd重量沉积的固体浓度约50%的整个尾矿)的最大最终高度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号