Post-earthquake dynamic stability reanalysis of Shapai arch dam abutment

机译:Shapai Arch Dam Beutment后地震动态稳定性再分析

获取原文

摘要

Shapai RCC dam is a 132 m high arch dam, and it is one of the few examples withstood great earthquakes, so it is significant to reanalyze the dynamic stability of dam abutment. A new way of abutment dynamic stability analysis method combining the advantages of finite element method and limit equilibrium method is proposed, and the limit cumulative displacement formula is put forward and acted as the stability criterion of sliders. Dynamic stability analysis of Shapai arch dam's abutment is conducted under two seismic waves and the overload study of Shapai arch dam is conducted under the artificial waves reflecting the 5.12 earthquake. The results show that Shapai arch dam's abutment is stable under the impact of 5.12 earthquake waves (a_h= 2.05 m/s~2), which is consistent with the actual seismic effects. However, under the action of design waves with 1% exceeding probability level in 100 years (a_h=5.31 m/s~2), the Shapai arch dam's left bank abutment is unstable, while on the right bank, the abutment keeps stable. When the left bank withstands the 3.2, 3.6 times artificial waves action, the instability happens on the left bank slider LI and L2 respectively. The instability happens on the right bank slider when there is a 4.2 times overload. The slip direction and the influence of safety factor changing with time to cumulative displacement are considered. The presented new way of abutment dynamic stability analysis can not only reflect the influence of period when dynamic safety factor is less than 1.0, but also it duration time, and also the reverse sliding effect in the seismic action.
机译:Shapai RCC大坝是一个132米高的拱门大坝,它是少数几个伟大的地震的例子之一,因此重新平静的动态稳定性是重要的。提出了一种新的邻接动态稳定性分析方法,其结合了有限元方法和极限平衡方法的优点,提出了极限累积位移公式,并充当了滑块的稳定性标准。 Shapai Arch Dam桥面的动态稳定性分析在两个地震波下进行,并在反射5.12地震的人造波下进行Shapai Arch Dam的过载研究。结果表明,在5.12地震波(A_H = 2.05 m / s〜2)的影响下,Shapai Arch Dam的邻接稳定,这与实际地震效应一致。然而,在100年(A_H = 5.31米/ S〜2的概率水平的设计波的作用下,Shapai Arch Dam的左岸基台不稳定,在右岸,桥面保持稳定。当左侧银行承受3.2,3.6倍的人工波动作动时,分别在左岸滑块LI和L2上发生不稳定。当有4.2倍过载时,右岸滑块在右岸滑块上发生不稳定。考虑了随着时间的推移与安全系数变化的滑移方向和对累积位移的影响。呈现的新的邻接动态稳定性分析方式不能反映动态安全系数小于1.0时的时期的影响,但也是持续时间,以及地震作用中的反向滑动效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号