首页> 外文会议>International Conference on Applied Mechanics and Materials >Drilling Technologies of Golden Ore District at Victoria Lake in Tanzania
【24h】

Drilling Technologies of Golden Ore District at Victoria Lake in Tanzania

机译:坦桑尼亚维多利亚湖金矿区钻探技术

获取原文

摘要

Greenstone belt golden ore prospecting project at Victoria Lake in Tanzania consisted of seven boreholes and a total of 2500 meters of drilling. In fact, twelve boreholes were completed and a total of 3201.2 meters of drilling were realized. It created our record of maximum drilling meters and drilling production in five months using one drill rig. The paper introduces drilling technologies used on this district from the aspects of geographic and geological overview, drilling equipments, drilling technologies, drill bit, drilling mud and main economic indicators. It may offer guidance for drilling in similar districts.
机译:在坦桑尼亚维多利亚湖的Greenstone皮带金矿勘探项目由七个钻孔组成,共有2500米的钻孔。事实上,12个钻孔完成,共有3201.2米的钻井。它使用一台钻机在五个月内创建了我们的最大钻井仪表和钻井生产的记录。本文从地理和地质概览,钻井设备,钻井技术,钻头,钻井泥和主要经济指标方面介绍了该地区的钻井技术。它可能为类似地区钻探的指导。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号