首页> 外文会议>Climate Change Conference: Impacts, Policy and Regulation >FERC Order 1000 Offers New Opportunities for Air Quality Considerations in Electric System Planning
【24h】

FERC Order 1000 Offers New Opportunities for Air Quality Considerations in Electric System Planning

机译:FERC ORDED 1000为电动系统规划中的空气质量考虑提供了新的机会

获取原文

摘要

Decisions resulting from regional transmission planning processes to assure future electric system reliability can have significant air quality impacts. Although it has always been possible for state and regional energy and environmental officials to collaborate closely, in reality it is not common. FERC Order 1000 provides air regulators with substantial new opportunities to have their voices heard. Order 1000 reinforces and expands the opportunity and need for constructive interagency collaboration. By participating in regional transmission planning processes- independently or in conjunction with their state PSCs-environmental regulators can help ensure that: (1) Regional transmission planning processes complement their state's efforts to protect public health through attainment of National Ambient Air Quality Standards; (2) The state's energy efficiency and renewable energy policies are properly considered as non-transmission alternatives; and (3) Measures identified to meet system reliability requirements assist rather than frustrate their state's efforts to improve environmental quality and public health. Many challenges loom that have joint energy and environmental impacts, including changing electricity demand characteristics, new more intelligent and interactive efficiency and grid technologies, the potential for increasing electrification of the transportation sector, and the effects of climate change. By taking advantage of the opportunity Order 1000 now offers, air regulators will find themselves in a better position to meet today's - and tomorrow's -challenges.
机译:区域传输规划流程以确保未来电力系统可靠性导致的决策可具有显着的空气质量影响。虽然国家和区域能源和环境官员始终可能会密切合作,但实际上它并不常见。 FERC订单1000为空中调节器提供了大量新机会,以便听到其声音。订单1000加强并扩大了建设性间际协作的机会和需求。通过参与区域输电规划processes-独立或与它们的状态的PSC-环境监管相结合可以帮助确保:(1)区域输电规划进程补充他们的国家通过国家环境空气质量标准达到保护公众健康的努力; (2)国家能源效率和可再生能源政策被适当地被视为非传输替代品; (3)确定符合系统可靠性要求的措施,而不是挫败其州的努力,以提高环境质量和公共卫生。许多挑战织机,具有联合能源和环境影响,包括不断变化的电力需求特征,新的更智能和互动效率和电网技术,增加运输部门电气化的可能性以及气候变化的影响。通过利用现在的机会订单1000,空中调节器将发现自己能够更好地满足今天的 - 而明天的-Challenges。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号