An Optimization and Planning Method Research to Determine Power Transmission Capacity of Clustering wind Farms Accounting Risk

机译:确定集群风电场核查风险电力传输能力的优化与规划方法研究

获取原文

摘要

Large-scale wind farms connected into main grid is accompanied by the reducing of the stability, reliability and security of the power system operation. So the risk cost becomes one of the important factors influencing the profit of transmission network expansion planning. This paper adopted the method of clustering wind power transmission. The objective function established in this paper reflecting the comprehensive benefits of transmission project defined the Pline (transmission capacity) as variable. In order to maximize the comprehensive benefits of the transmission project, the influence of transmission constructing cost, the congestion loss probably caused by a low transmission capacity as well as the cost of risk were taken into account. Calculation of risk is a very complex mixed integer nonlinear problem, so we used Monte-Carlo Simulation to solve this question. Example shoes that the proposed method can achieve optimal transmission capacity, transmission project benefit and planning.
机译:连接到主电网的大型风电场伴随着减少电力系统操作的稳定性,可靠性和安全性。因此,风险成本成为影响传输网络扩展规划利润的重要因素之一。本文采用了集群流量传输的方法。本文建立的客观函数反映了传输项目的综合效益定义了作为变量的PLINE(传输能力)。为了最大限度地提高传输项目的综合效益,传输构建成本的影响,可能由低传输能力和风险成本引起的拥堵损耗。计算风险是一个非常复杂的混合整数非线性问题,因此我们使用Monte-Carlo模拟来解决这个问题。所提出的方法可以实现最佳传输能力,传输项目受益和规划的示例鞋。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号