首页> 外文会议>International Conference on Engineering and Risk Management >Risk Assessment Based On Fuzzy Network (F-ANP) In New Campus Construction Project
【24h】

Risk Assessment Based On Fuzzy Network (F-ANP) In New Campus Construction Project

机译:新校园建设项目模糊网络(F-ANP)的风险评估

获取原文

摘要

From the characteristics of New Campus Engineering Project, the paper uses the method of F-ANP to evaluate risks of New Campus Engineering Project by combining the ANP and fuzzy comprehensive evaluation. New Campus Engineering Project belonging to higher risk project is obtained, so as to provide evidence for control the risk of New Campus Engineering Project,,
机译:从新校园工程项目的特点来看,本文采用F-ANP的方法来通过结合ANP和模糊综合评估来评估新校园工程项目的风险。获得了属于更高风险项目的新校园工程项目,以便为控制新校园工程项目的风险提供证据,

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号