Planning, Organization And Success Of A Wide, Detailed Geophysical Survey Offshore Makassar Strait

机译:规划,组织和成功广泛,详细的地球物理调查海上帕米萨斯海峡

获取原文

摘要

The Oil & Gas industry has seen recently a strong push towards high end goals required by the tight bond between economics, the time for the development of an investment, planning and finally construction and service of plants. This is the specific case of the Jangkrik field development. As part of the POD (Plan of Development) approval by the Government of Indonesia, eni Indonesia committed to a “fast track” strategy in which the field would come into production in 2016 and consequently directed all efforts towards early development of the engineering design for the production facilities. Thanks to the execution of the geophysical site investigations during the early project design stages, several elements were discovered, which quality allowed a much clearer picture of several morphologic elements affecting the field design. Among the most important decisions that were taken during this design phase, we can consider the one to relocate the FPU in a shallower water depth (100mt WD on the continental shelf) with respect to the preliminary design (about 320mt WD along the escarpment). Such decision, if not taken on time, would have created major reworks during the execution phase, together with a potential big delay in the project and potentially jeopardizing the possibility of the Jangkrik North East integration. Another important decision was the one relevant to the use of rigid versus flexible flow lines. This is also critical for the procurement activities to be progressed on time and also for the flow assurance studies. This type of decisions, taken during this phase of the project, in the long term will lead to better design, minimize re-works, reduce costs and time and ensure project integrity.
机译:最近,石油和天然气行业已经看到了经济学之间紧密债券所要求的高端目标,发展投资,规划和最终建设和植物的建设和服务的时间强劲推动。这是Jangkrik现场发展的具体情况。作为印度尼西亚政府批准的POD(发展计划),ENI印度尼西亚致力于“快速轨道”策略,其中该领域将于2016年进入生产,从而指导了对工程设计的早期发展的所有努力生产设施。由于在早期项目设计阶段执行地球物理网站调查,发现了几个要素,质量允许更清晰地了解影响现场设计的形态学元素。在这个设计阶段采取的最重要的决定中,我们可以考虑将FPU重新定位在较浅的水深(欧式货架上100MT WD上),初步设计(沿着悬崖沿着悬崖)约320mt WD)。如果没有准时,在执行阶段将在执行阶段创造重大返工,以及项目的潜在大延误,潜在危害Jangkrik North East融合的可能性。另一个重要的决定是与使用刚性与柔性流线相关的决定。这对于按时进行的采购活动也是至关重要的,也是为了流动保障研究。在该项目的这一阶段进行了这种类型的决策,长期将导致更好的设计,最大限度地减少重新工作,降低成本和时间并确保项目完整性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号