首页> 外文会议>Coiled Tubing and Well Intervention Conference and Exhibition >Successful Coiled-Tubing Application for Milling, Cleanout, and Kickoff Operations of Horizontal Wells Completed With Liner for Multistage Hydraulic Fracturing Project on Priobskoe Oil Field
【24h】

Successful Coiled-Tubing Application for Milling, Cleanout, and Kickoff Operations of Horizontal Wells Completed With Liner for Multistage Hydraulic Fracturing Project on Priobskoe Oil Field

机译:成功的卷材管道应用程序用于磨削,清洁和横向井的操作,为Priobskoe油田的多级液压压裂项目进行了衬垫

获取原文

摘要

Historically, coiled tubing (CT) services were positioned as highly tailored services in Russian Federation. Main operations for CT application were post-frac cleanouts (CO) and kick-off (KO) of vertical and slightly deviated wells. Lately, with increasing of horizontal wells quantity, CT application scope became wider: logging, perforating, fishing jobs, CO, milling and other operations. With increasing interest to multi-stage hydraulic fracturing technology, Coiled Tubing application has to grow to meet client demands. In wells with horizontal section 1000 m long, milling of different sizes balls and seats became the most challenging and efficient technical solution. Located in Khanty-Mansiysk District of Western Siberia, Priobskoe field is one of the world’s largest oilfields. Due to low permeability almost 80% of reserves are hardly recoverable. Oilfield development plan include post drill fracturing of all new completed wells. In order to maximize the hydrocarbon recovery field-proven technology enabling multi-stage hydraulic fracturing of an uncemented completion in one pumping treatment became a consistent decision for well treatment. For the first job following workflow was applied: multi-stage hydraulic fracturing completion was installed and 7 zones were fractured one by one. Technology implies that during pumping, at specified stage time, balls are dropped (one at time) from the surface to open the Frac Ports (FP). After the treatment, the most efficient technical solution to remove the balls is to mill them using CT. Following milling operations the well was cleaned out and kicked off with nitrogen. In designing a Coiled Tubing job the critical part is BHA and string selection. Selected mill should be strong enough for milling Frac Port iron and long enough to prevent damage of FP, by side tracking from it to reservoir. . As per project program 4 wells have been completed with technology described above. Current production rates show high efficiency of multi-stage hydraulic fracturing technology over traditional well completions. This article describes technical and operational details of the project, candidate selection process, job planning and determines a way to find an optimum technique to meet client demands. Analysis of 4 wells completed with multi-stage fracturing liner is shown in comparison with standard completion in the article.
机译:历史上,盘绕管道(CT)服务被定位为俄罗斯联邦的高度量身定制的服务。 CT应用的主要操作是垂直和略微偏离井的FRAC清除(CO)和启动(KO)。最近,随着水平井数量的增加,CT应用范围变得更宽:伐木,穿孔,捕鱼工作,CO,铣削等操作。随着对多级液压压裂技术的兴趣越来越兴趣,卷绕管道应用必须增长以满足客户需求。在井中的井中1000米长,不同尺寸的球和座椅的铣削成为最具挑战性和高效的技术解决方案。 Priobskoe领域位于西伯利亚西部西伯利亚Khanty-Mansiysk区,是世界上最大的油田之一。由于低渗透率,近80%的储备几乎无法恢复。油田开发计划包括所有新建井的钻头压裂。为了最大限度地提高碳氢化合物回收现场证明技术,在一个泵送处理中实现了多级液压压裂的未发布完成变得一致的良好治疗决定。对于应用工作流程的第一份作业:安装了多级液压压裂完成,并将7个区域逐一断裂。技术意味着在泵送期间,在指定的阶段时间,从表面掉下球(一次)以打开FRAC端口(FP)。治疗后,最有效的技术解决方案以使用CT铣削它们。在铣削操作之后,将井清除并用氮气踢出。在设计盘绕的管道工作时,关键部分是BHA和串选择。选定的轧机应该足够强大,足以铣削FRAC港铁,足够长,以防止FP的损坏,并通过侧面跟踪到水库。 。根据项目计划4井已经完成了上述技术。目前的生产率显示出在传统井底上的多级水力压裂技术的高效率。本文介绍了项目的技术和操作细节,候选选择过程,工作计划,并确定找到最佳技术以满足客户需求的方法。根据物品中的标准完成,显示了用多级压裂衬里完成的4个孔的分析。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号