首页> 外文会议>SPE Arctic and Extreme Environments Technical Conference and Exhibition >Complex of New Solutions for Well Cementing in Deep North Conditions
【24h】

Complex of New Solutions for Well Cementing in Deep North Conditions

机译:深层北方条件下井井井的新解决方案复合

获取原文

摘要

The development of Arctic offshore and outer continental shelf outlines for specialists a series of complex technical tasks related, in addition, to well construction (drilling and casing). Poorly developed transport infrastructure, severe climate conditions, permafrost zones and other complications require the application of an integrated approach to well drilling and construction design. The description of innovation integrated of production solutions and approaches, applied at well cementing in the fields of the Yamal Peninsula, including the solution of a cementing unit with mixing and pumping systems (with an integral dry mixture pneumatic system) integrated into the echelon rig, is presented in the paper. And also the description and analysis of application of the unified compositions of cement slurries and preflushes, specially developed for this “on-the-fly” mixing system, that enable to facilitate materials’ delivery and storage operations at remote locations and encourage simplifying cementing technologies.
机译:北极的开发近海和外大陆架轮廓为专家提供一系列相关的复杂的技术任务,此外,为建井(钻孔和套管)。不发达的交通基础设施,严重的气候条件下,永久冻土带等并发症需要的综合方法的应用,钻井和施工图设计。创新的描述集成的生产解决方案和方法,在亚马尔半岛的字段,包括一个固井单元与混合和泵送系统的溶液固井应用(具有一体的干混合物的气动系统)集成到梯队钻机,呈现在纸上。而且还描述和水泥浆和preflushes的统一组成的应用程序的分析,专门为此制定了“关于即时”混合系统,这使得便于材料的交货和存储操作在偏远地区,鼓励简化固井技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号