首页> 外文会议>International Young Geotechnical Engineers Conference >CASE HISTORY: CHALLENGES DURING THE DESIGN AND CONSTRUCTION OF A CELLULAR COFFERDAM
【24h】

CASE HISTORY: CHALLENGES DURING THE DESIGN AND CONSTRUCTION OF A CELLULAR COFFERDAM

机译:案例历史:围框设计和建设期间的挑战

获取原文

摘要

Projects often face design changes during their construction phase. These changes lead engineers to a series of redesign and sensitivity analysis in order to evaluate their influence. In this paper a series of changes in site conditions and constructions deviations during the construction of a cellular cofferdam in Puerto Belgrano Naval Base (Argentina) are presented. Their effect on overall stability, uplift failure, as well as results obtained for analytical an numerical models are showed.
机译:项目经常在施工阶段面临设计变化。这些更改导向工程师的一系列重新设计和敏感性分析,以便评估它们的影响力。在本文中,提出了一系列现场条件和建筑偏离期间的一系列变化,在贝尔格拉诺海军基地(阿根廷)的围场围堰施工期间偏离。它们对整体稳定性,隆起故障以及用于分析数值模型的结果的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号