首页> 外文会议>CIRP International Conference on Industrial Product-Service Systems >Requirements for transfer and application of IPS~2 resource planning - case-study of a global machine tool manufacturer
【24h】

Requirements for transfer and application of IPS~2 resource planning - case-study of a global machine tool manufacturer

机译:IPS〜2资源规划的转移和应用要求 - 全球机床制造商的情况研究

获取原文

摘要

Depending on the contracted business model of an Industrial Product-Service System (IPS~2), different processes have to be carried out during the operation phase. The required resources to carry out these processes have to be planned with strategic and operational methods. However, these methods have not yet been utilized in industrial applications. In this paper, the requirements for the transfer and application of the IPS~2 resource planning are discussed based on a case study of a global German machine tool manufacturer. The results of the review give valuable indications for the integration of the planning tool for existing machine tool manufacturers.
机译:根据工业产品 - 服务系统(IPS〜2)的合同业务模式,必须在操作阶段进行不同的过程。执行这些流程的所需资源必须以战略和运营方法计划。然而,这些方法尚未在工业应用中使用。本文基于全球德国机床制造商的案例研究,讨论了IPS〜2资源规划的转移和应用的要求。审查结果为现有机床制造商的规划工具集成了有价值的迹象。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号