首页> 外文会议>International Conference on Integrated Systems and Management for Energy, Development, Environment and Health >Numerical simulation of dispersion and deposition of radioactive materials from the Fukushima Daiichi nuclear power plant in March of 2011
【24h】

Numerical simulation of dispersion and deposition of radioactive materials from the Fukushima Daiichi nuclear power plant in March of 2011

机译:2011年3月福岛Daiichi核电站放射性材料分散和沉积的数值模拟

获取原文

摘要

In order to know the detail of the deposition and distributions processes of radioactive materials emitted from the Fukushima Daiichi nuclear power plant after the nuclear accident accompanied the great Tohoku earthquake and tsunami on 11 March 2011, dispersion and deposition process of radioactive materials were simulated using a pair of numerical models, A2Cflow and A2Ct&d. The model reproduced clearly the observed spatial distributions of deposition amount in main part of East Japan. Although there were some discrepancies between the simulated amount and observed amount somewhere, the simulation can explain when and why the special distributions were formed. These discrepancies were likely due to uncertainties in the simulation of emission rate due to no detail information of the emission rate.
机译:为了了解从核事故发生福岛Daiichi核电站发出的放射性物质的沉积和分布过程的细节,核事故在2011年3月11日左右地震和海啸中,使用A模拟放射性物质的分散和沉积过程对数值模型,A2cflow和A2CT&D.该模型清楚地复制了东日本东日本主要部分的观察到的沉积量的空间分布。虽然模拟量和观察量在某处观察到了一些差异,但模拟可以解释何时何种以及为何形成特殊分布。由于没有减排率的详细信息,这些差异可能是由于发射率的模拟中的不确定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号