【24h】

Research on Geosynthetics in Tailings Dam Reinforcement

机译:尾矿坝加固土工合成措施研究

获取原文

摘要

With the tailings dam reinforcement project newly built in Yakou as the example and limit equilibrium horizontal slice method as the methodology, this paper has researched the feasibility of applying geosynthetics in fine tailings dam reinforcement. The results from limit equilibrium horizontal slice method show that the stability of reinforced tailings dam with geosynthetics increases by 14~17%; while results from numerical simulation method show that the principal stress vector direction and the principal displacement vector direction of the dam body can be changed to be favorable to the stabilization of dam by using geosynthetics to reinforce the tailings dam.
机译:随着尾矿大坝加固项目作为雅库新建的项目作为示例和限制平衡水平切片方法作为方法,本文研究了在精细尾矿坝加固中施加地磁合成的可行性。极限平衡水平切片方法的结果表明,钢筋尾矿坝具有地质合成率的稳定性增加了14〜17%;虽然来自数值模拟方法的结果表明,通过使用土工合成仪加强尾矿坝,可以改变坝体的主应力矢量方向和坝体的主要位移矢量方向,以便有利于水坝的稳定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号