Study on the optimization of Public Construction project duration

机译:公共建设项目持续时间优化研究

获取原文

摘要

This article gathers 16 factors which influence the duration of public construction project on the basis of research and analysis, and forms hierarchical relationships and causal relationships of the factors through improved interpretive structural model. Finally, comes up with several recommendations on the issue, further, the research and discussion on public construction project control and optimization of construction duration of our country are carried out.
机译:本文在研究和分析的基础上收集了影响公共建设项目持续时间的16个因素,通过改进的解释结构模型来形成分层关系和因果关系。最后,提出了关于该问题的若干建议,进一步推出了关于公共建设项目控制的研究和讨论和我国建设期限的优化。