A Study on Public Construction Project Duration Risk Identification and Evaluation

机译:公共建设项目持续时间风险识别与评价研究

获取原文
获取外文期刊封面目录资料

摘要

According to the intricate dynamic relationship of the duration management system, the paper identified risk factors for the object. Then established a comprehensive integrated Public Construction Project duration risk assessment model with the application of game theory-based weighting method. The model is validated effective and reasonable through simulation analysis. And it also provides a new way of thinking in the duration risk assessment. Public Construction Project is the infrastructure construction project which is closely related to people's lives and invested by the government. As the implementation of a large number of Public Construction Project, the effectiveness of project management method has been highlighted as the bottleneck of the project construction. In the process of management, the theory research especially the delay discipline is very limited. The existing theory research results have important guiding significance to the analysis of the article. However, the traditional identification method of schedule risk focused on the research of problems related to the project, and did not consider the whole project as a system. Due to the dynamics and complexity characteristics of schedule management, the traditional analysis method have some limitations in the risk identification. Inappropriate recognition method not only can't reflect the systematic characteristics of schedule management, it is also hard to keep the project from risk totally. From the perspective of system thinking. On the one hand, using the method of system dynamics to bring risk factors into the schedule management system. Take the feedback, control theory to analyze the interaction between factors to identify the main elements that influence the schedule management system; On the other hand, based on the identified main factors adopt the appropriate risk assessment method to sort the influence degree.
机译:根据持续时间管理系统的错综复杂的动态关系,纸张确定了对象的风险因素。然后建立了一项全面的综合公共建设项目持续时间风险评估模型,应用了基于博弈论的权重方法。通过仿真分析验证了该模型的有效且合理。它还提供了一种在持续时间风险评估中思考的新方式。公共建筑项目是基础设施建设项目,与人民的生命密切相关并由政府投资。作为大量公共建设项目的实施,项目管理方法的有效性被突出显示为项目建设的瓶颈。在管理过程中,理论研究特别是延迟纪律非常有限。现有理论研究结果对文章分析具有重要的指导意义。然而,传统的安排风险方法侧重于研究与项目有关的问题,并没有将整个项目视为系统。由于时间表管理的动态和复杂性特征,传统的分析方法对风险识别有一些局限性。不恰当的识别方法不仅无法反映安排管理的系统特征,也很难完全保持项目的风险。从系统思维的角度来看。一方面,使用系统动态的方法将风险因素带入计划管理系统。采取反馈,控制理论来分析因素之间的相互作用,以确定影响安排管理系统的主要元素;另一方面,根据所确定的主要因素采用适当的风险评估方法来对影响程度进行排序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号