The Jubilee Field is the first major offshore development in Ghana. The Field was discovered in 2007 and commenced production in November 2010. In mid - 2011 several wells began experiencing productivity declines A formation damage study was commissioned to evaluate and identify the cause (s) of productivity decline. A number of potential causes of productivity impairment were identified and assessed. Amongst those causes were fines migration and plugging of the sandface completion screens and perforation tunnels. A zero cost dead oil bullheading operation was recommended to test the possibility of fines migration and also dislodge any fines or debris that may have accumulated and plugged the Frac-pack screens. Three candidate wells were selected for the bullheading operation and a total of 8 bullhead treatments were carried out. Post-treatment results suggested temporary improvement in well Productivity Index (PI). However, the improvement in PI was short-lived and in most cases declined to pre-treatment levels within 10-14 days. The fact that an improvement in PI was observed for 10-14 days lead to the initial conclusions that the PI decline was the result of near-wellbore damage due to some form of movable debris in the near wellbore region (possibly fines). The ability to perform this operation using the existing subsea and FPSO installation posed several challenges. However, prudent team effort ensured competent job design and execution. Several lessons learnt from previous jobs were reviewed and incorporated in subsequent treatment designs. This paper summarizes the methodology used to assess, identify and eliminate potential causes of productivity decline on the Jubilee Field and how a dead oil bullheading operation conducted on three candidate wells aided in assessing the severity of damage. The paper also discusses the lessons learnt from executing these jobs.
机译:Jubilee领域是加纳的第一个主要的离岸发展。该领域于2007年发现,2010年11月开始生产。2011年中期,几个井开始经历生产力,委托损害研究的形成损害研究评估和确定生产力下降的原因。确定和评估了许多潜在的生产力损害原因。在这些原因中,罚款迁移和堵塞砂面完成屏幕和穿孔隧道。建议使用零成本死口油头操作来测试罚款迁移的可能性,并且还向任何可能积累和插入FRAC-Pack屏幕的粉末或碎屑脱落。选择了三个候选井进行了斗牛头操作,并进行了总共8个斗牛嘴处理。治疗后结果表明井生产力指数(PI)临时改善。然而,PI的改善是短暂的,在大多数情况下,在10-14天内下降到治疗水平。观察到PI的改善10-14天的事实导致PI下降是由于近井筒区域(可能是罚款)的某种形式的可移动碎片,因此PI下降是近井眼损伤的结果。使用现有海底和FPSO安装执行此操作的能力提出了几个挑战。但是,谨慎的团队努力确保了有职位的工作设计和执行。从以前的工作中吸取了几项教训,并在随后的治疗设计中纳入并纳入。本文总结了用于评估,识别和消除Jubileme领域的生产率下降潜在原因的方法以及在评估损害严重程度时如何在三个候选井上进行的死油牛头行动。本文还讨论了从执行这些工作的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号