首页> 外文会议>International Production and Operations Conference and Exhibition >Solving the Complex Equation of Production Build-up via the Implementation of Integrating Processes: A Team Approach Pilot to Meet North Kuwait's Production Target
【24h】

Solving the Complex Equation of Production Build-up via the Implementation of Integrating Processes: A Team Approach Pilot to Meet North Kuwait's Production Target

机译:通过整合流程的实施解决复杂的生产建设方程:团队方法试点以满足北科威特的生产目标

获取原文

摘要

Production has two components - the subsurface potential and the actual production to feed the export line. In North Kuwait, sub surface potential had never been an issue for any speculation. The most difficult part is to integrate all resources, synchronize with each other and create "wonderful symphony" leading to actual production delivery. Several processes have been developed and matured now to gear up the asset to meet the challenging production target for 2010-11 which indicates a jump in production by about 23% in a single year. In this effort, major processes to play a key role are: Development Well Subsurface Selection Process to optimize the best wells in terms of potential; New Development Well Assurance Process with Key Opportunities for Improving integration with key service providers to NK Asset such as Drilling Group (rig schedule, materials); Production Operations (Flow line/header connections, process capacity); Water Handling (Flow line/header connections, Water injection Supply capacity); Artificial Lift to synchronize ESP equipment availability in line with the well/ rig availability, Project Management (Flow line installation & rationalization), Learning's from Post Appraisal of Wells drilled in last few years; Surveillance Plan - data acquisition, how new information helps to minimize reservoir uncertainties; Drilling & Completion Programs - appropriate technology choices to meet well and reservoir objectives such as multi-zone needs, rigless access for surveillance or interventions, NCWs and artificial lift requirements.
机译:生产有两个组件 - 地下潜力和实际生产饲料出口线。在北科威特,亚表面潜力从来没有任何猜测的问题。最困难的部分是集成所有资源,相互同步,并创建“精彩交响乐”,导致实际生产交付。现在已经开发了几个过程,以满足资产,以满足2010-11的具有挑战性的生产目标,这表明在一年中跃升了约23%。在这项工作中,发挥关键作用的主要流程是:发展良好的地下选择过程,以优化潜力的最佳井;新的发展良好的保证过程,具有改善与关键服务提供商集成到NK资产的关键机会,如钻井集团(钻机计划,材料);生产操作(流量线/头部连接,处理容量);水处理(流量线/倒栽销连接,注水供应能力);人工升降机同步ESP设备可用性符合井/钻井设备的可用性,项目管理(流线安装和合理化),学习从过去几年钻井的井中熟练的疗程。监控计划 - 数据采集,新信息如何有助于最小化水库不确定性;钻井和完工计划 - 适当的技术选择,以满足井和水库目标,如多区需求,监控或干预措施,NCW和人工升力要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号