首页> 外文会议>International Conference on Civil Engineering, Architecture and Sustainable Infrastructure >Water Diversion and Sediment Prevention of Head Complex of CCS Hydropower Station
【24h】

Water Diversion and Sediment Prevention of Head Complex of CCS Hydropower Station

机译:CCS水电站头部复合体的进液和沉积物预防

获取原文

摘要

Low dam of the head complex of CCS hydropower station results in its small capacity, in order to reduce the wear of turbines, higher requirement is demanded for the head complex design. Water diversion and sediment prevention system design together with general layout of the project, a "forward flushing, flood discharging, lateral intaking" system is formed. The basic purpose of reducing sediment diversion is reached by the comprehensive measures of "interception, sedimentation, ejection", combined with reasonable reservoir operation scheduling system.
机译:CCS水电站的头部复合物的低温会导致其容量小,以减少涡轮机的磨损,需要更高的要求对头部复杂的设计。将沉积物和沉积物预防系统设计与项目的一般布局一起,形成“前进冲洗,泛尘,横向入学”系统。通过“拦截,沉降,喷射”,结合合理的储层操作调度系统,达到减少沉积物转移的基本目的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号