首页> 外文会议>Arctic Technology Conference >Countermeasures for Bending and Abrupt Uplift of A Full-scale Test Chilled Gas Pipeline Observed at Boundary between Frozen Ground and Talik
【24h】

Countermeasures for Bending and Abrupt Uplift of A Full-scale Test Chilled Gas Pipeline Observed at Boundary between Frozen Ground and Talik

机译:在冻土和塔利克之间的边界观察到全尺寸试验冷却气体管道的弯曲和突然隆起的对策

获取原文

摘要

In this paper the authors report the vertical bending properties of a test chilled gas pipeline and the countermeasures of the bending. A full-scale field experiment of the chilled gas pipeline system was conducted in Fairbanks, Alaska from 1999 to 2005. The length of the test pipeline was 105m and the diameter was 0.9m. The circulated chilled air was –10°C. One-third of the pipeline was buried in frozen ground and the rest of it was placed in talik. At the end of July 2003, circulation of the chilled air ceased, however, monitoring of the thaw settlement-related properties of the test pipeline continued until the middle of April 2005. The following results were presented at the 2nd ATC: 1) As the frost-bulb around the pipeline in talik section formed, the test pipeline in the talik section moved upward, resulting in bending of the pipeline at the boundary. 2) In summers, frozen overburden soil of the pipeline became thinner due to thawing of active layer above. The pipeline buried in frozen section moved upward abruptly, fracturing the thinning frozen overburden ground. 3) The phenomenon mentioned in 2) occurred in successive summers, and the pipeline uplift in frozensection continued. 4) In relation with 1), the upward movement in talik section was confirmed by frost heaving of the pipe foundation. In this report the bending behavior of the test pipeline is described and the several methods to deal with the bending are proposed.
机译:在本文中,作者报告了测试冷却气体管道的垂直弯曲性能和弯曲的对策。从1999年至2005年,阿拉斯加的Fairbanks进行了冷却气体管道系统的全规模场实验。试管林的长度为105米,直径为0.9m。循环的冷空气为-10°C。其中三分之一的管道被冻结在冻土中,其余部分被置于塔利克。于2003年7月底,寒冷的空气的流通持续监测测试管道的解冻结算相关性质,持续到2005年4月中旬。以下结果呈现在第2届ATC:1)作为在Talik部分的管道周围霜灯泡形成,Talik截面中的试管线向上移动,导致在边界处弯曲管道。 2)在夏天中,由于在上面的活性层的解冻,管道的冷冻覆盖土壤变薄。埋在冷冻段中的管道突然向上移动,压裂稀疏的冷冻覆盖物。 3)2)中提到的现象发生在连续夏季,并持续重新溶解的管道隆起。 4)与1)相关,通过管基础的霜冻确认了Talik部分的向上运动。在本报告中,描述了测试管道的弯曲行为,并提出了处理弯曲的几种方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号