The Lloydminster Saskatchewan area Pikes Peak steam project has been on production since 1982. A key part of the development strategy was use of an undeveloped pressure isolation wall to allow the two halves of the pool to be developed using different time schedules and exploitation processes. Use of the pressure isolation wall allowed different exploitation options to be used, but during late project life the oil left in the wall needed to be recovered to enhance project economics. A significant challenge to recovery of the oil in the wall was the lack of pressure containment or oil saturation on both flanks, resulting in the need for a very gentle recovery process to avoid pushing the oil outside the wall. On the basis of numerical simulation results the recovery process selected for the wall was use of two CSS horizontal wells operated in a gentle manner. After the horizontal wells were drilled, however, temperature logs showed the reservoir surrounding one of the horizontal wells had already been heated by offsetting steam injection, and that well has been continually produced at good rates without the need for steam stimulation. The second new horizontal wall well has been successfully operated using the CSS process designed using numerical simulation. The results of this field study show that the oil in a wall used to pressure isolate sections of a steam project pool can be economically recovered without pushing the oil into the adjacent depleted areas by use of processes designed to account for local wall conditions.
机译:Lloydminster Saskatchewan Area Area Pikes Peak Steam项目自1982年以来一直在生产。开发战略的一个关键部分是使用未开发的压力隔离墙,以允许使用不同的时间表和开发过程开发池的两半。使用压力隔离墙允许使用不同的开采选项,但在延迟项目期间,墙壁留下的油需要恢复,以增强项目经济学。对墙壁中的油恢复的重大挑战是两侧缺乏压力储存或油饱和度,导致需要非常温和的恢复过程,以避免将油推动墙壁外。在数值模拟结果的基础上,为墙壁选择的恢复过程使用了以温和的方式操作的两个CSS水平孔。然而,在钻井水平孔之后,温度日志展示了已经通过抵消蒸汽喷射已经加热的水平井周围的储存器,并且在不需要蒸汽刺激的情况下连续产生井。使用使用数值模拟设计的CSS流程成功运行了第二个新的水平墙。该场研究的结果表明,用于压力分离蒸汽项目池的壁部分的壁中的油可以通过使用设计用于占局部墙壁条件的过程将油推入相邻的耗尽区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号