首页> 外文会议>POWER-GEN Europe Conference and Exhibition >Flue Gas Desulfurization Systems (FGD) Incorporated In a Unique Multi Functional Chimney Configuration
【24h】

Flue Gas Desulfurization Systems (FGD) Incorporated In a Unique Multi Functional Chimney Configuration

机译:烟道气脱硫系统(FGD)以独特的多功能烟囱配置掺入

获取原文

摘要

Israel Electric Corporation (IEC) is in an advanced implementation stages of a "Mega" Environmental Project, which incorporates installation of full environmental measures for ten (10) existing coal fired units, until 2016. Each unit will be equipped with Primary measures firing system upgrade, Selective Catalytic Reduction systems (SCR), Flue Gas Desulphurization Systems (FGD) and Flue Gas Conditioning systems (FGC). Environmental emissions will be lowered to challenging figures of 10010030 with future provisions for 505030. Units 5&6 at Orot Rabin Power Station (2X575MW) will incorporate a new unique multi functional chimney configuration. The key advantages of the application are compact space foot print, involving precious land saving of 30% at the Mediterranean Seashore. The project implementation involves high engineering capabilities, integration, construction and project management skills, with emphasis on maintainability and constructability. Full multi disciplinary engineering of the project is performed at Israel Electric Corporation Engineering Division, located in Haifa. Commonwealth Dynamics - USA (CDI) was nominated as the stack erection Contractor, and Doosan - Korea (DHI) is the Flue Gas Desulphurization system Supplier. Foundations have been completed and chimney shell is currently in advanced stages of construction. The project is scheduled to be commissioned in April 2014.
机译:以色列电气公司(IEC)处于一个“Mega”环境项目的先进实施阶段,该项目纳入了十(10)个现有燃煤单位的全面环境措施的安装,直到2016年。每个单位将配备初级措施射击系统升级,选择性催化还原系统(SCR),烟道气脱硫系统(FGD)和烟气调理系统(FGC)。环境排放将降低到挑战100 100 30的数据,未来的50 50 30的规定。 Orot Rabin发电站(2x575MW)的单位5和6将采用新的独特多功能烟囱配置。应用的关键优势是紧凑的空间脚印,涉及地中海海滨的珍贵土地储蓄30%。项目实施涉及高工程能力,集成,建设和项目管理技能,重点是可维护性和结构性。该项目的全部多学科工程是在以色列电气公司工程部门进行的,位于海法。英联邦动力学 - 美国(CDI)被提名为堆栈勃起承包商,斗山 - 韩国(DHI)是烟气脱硫系统供应商。基金会已完成,烟囱壳目前处于高级施工阶段。该项目计划于2014年4月委托进行委托。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号