首页> 外文会议>International Conference on Civil, Architectural and Hydraulic Engineering >Monitoring and Reinforcement Technology of Passing Weak and Broken Rock Strata for Tunnel Boring Machine
【24h】

Monitoring and Reinforcement Technology of Passing Weak and Broken Rock Strata for Tunnel Boring Machine

机译:隧道镗床传递弱和破碎岩层的监测和加固技术

获取原文

摘要

The stability control of surrounding rock is a relatively important problem in tunnel boring machine (TBM) construction. The tunnel convergence deformation value was monitored in field while TBM passing weak and broken section of hydraulic tunnel. The correlation between tunnel convergence and surrounding rock stability is analyzed. The monitoring results show that: the characteristic of weak and broken strata is closely correlated with some geological conditions, such as fault development, intrusive contact of orthophyre and lamprophyre veins. These supporting measures can well ensure the stability of surrounding rock in weak and broken section, such as sealing the inverted arch by using concrete of C25, reinforcing the inverted arch by steel arch of I10 and anchor construction in the roof. There is great difference between the properties of the weak and broken rocks on both sides, which is the main reason of the large tunnel convergence deformation. The monitoring results can provide reference for similar engineering in the future.
机译:周围岩石的稳定性控制是隧道镗床(TBM)结构中的一个相对重要的问题。在现场监测隧道收敛变形值,而TBM通过液压隧道的弱和断裂部分。分析了隧道收敛与周围岩石稳定性之间的相关性。监测结果表明:弱和破碎的地层的特征与一些地质条件密切相关,如故障开发,侵入性矫形器和Lamprophyre静脉的侵入性接触。这些配套措施可以确保弱和破碎的部分中周围岩石的稳定性,例如使用C25的混凝土密封倒拱,通过I10的钢拱加固倒拱和屋顶的锚施工。两侧弱和破碎岩石的性质之间存在很大差异,这是大隧道收敛变形的主要原因。监测结果可以为未来的类似工程提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号