首页> 外文会议>International Conference on Civil, Architectural and Hydraulic Engineering >Applied research on the improved Great Lakes Calculus Model used in the flood control scheduling of the middle and lower Yangtze river
【24h】

Applied research on the improved Great Lakes Calculus Model used in the flood control scheduling of the middle and lower Yangtze river

机译:中下游洪水控制调度改进的大湖微积分模型的应用研究

获取原文

摘要

This paper used the measured data of water level and flow on the cross-sections of middle and lower Yangtze River during flood season (May-September) from 1981 to 2015. According to the evolution of the state of river course, flood and sediment, we calculated the flood routing with the improved Great Lakes flood routing model on the sections of Yichang to Shashi, Shashi to Chenglingji, Chenglingji to Hankou, Hankou to Hukou. And the results of the calculation was checked with the measured data in 1983, 1998,2002 and 2015, to verify the relationship between river and lake and the relevant parameters, and to provide detailed, accurate information for the subsequent models. The calculation results showed that the research was practical, and can be used as the basis of decision.
机译:本文在汛期(5月至9月)从1981年到2015年期间使用了水平和下游横截面的水位和流动的测量数据。根据河流河道,洪水和沉积物的演变我们计算了与宜昌的改进的大湖泊洪水路线模型的洪水路线,宜昌,汉志,汉口,汉口,汉口。在1983年,1998,2002和2015年的测量数据中检查了计算结果,以验证河流和湖泊之间的关系以及相关参数,并为后续模型提供详细的准确信息。计算结果表明,该研究实用,可作为决定的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号