首页> 外文会议>International meeting on severe accident assessment and management >Estimation of the Depressurization Process of Fukushima Dai-ichi NPP Unit 1 with SAMPSON
【24h】

Estimation of the Depressurization Process of Fukushima Dai-ichi NPP Unit 1 with SAMPSON

机译:用桑普森估算Fukusima Dai-Ichi NPP单元1的减压过程

获取原文

摘要

TEPCO announced that the safety relief valves of Fukushima Dai-ichi NPP Unit-1 were never manually opened during the accident due to the shortage of DC power. However, the measured reactor pressure was about 1 MPa at 2:43 of March 12. At that moment the reactor vessel bottom head is believed not to have failed according to the severe accident analyses by TEPCO. Such unanticipated depressurization might accelerate the core uncovery and on the other hand delay the containment failure caused by the direct containment heating. The authors modeled the creep failure of the stainless steel guide tubes of source range monitor (SRM) in the core and estimated the possible depressurization mechanism oj the Unit 1 using a severe accident analysis code SAMPSON.
机译:Tepco宣布,由于DC电力短缺,在事故中,从未在事故中手动打开福岛DAI-ICHI NPP Unit-1的安全浮雕阀。然而,在3月12日的2:43,测量的反应器压力为约1MPa。此时,反应器容器底部头部被认为不根据Tepco的严重事故分析而失败。这种意想不到的减压可能会加速核心揭露,另一方面延迟了由直接遏制加热引起的容纳失效。作者在核心中模拟了源极量程监测器(SRM)的不锈钢引导管的蠕变失效,并估计了使用严重的事故分析代码SAMPSON的单元1的减压机制OJ。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号