【24h】

TOP FIVE CHALLENGES IN MINE PLANNING

机译:矿山规划中的五大挑战

获取原文

摘要

Mining companies today are under increasing pressure to boost output from their existing mines and to bring new projects online quickly. Fundamental to the long-term performance of an operation is geologic modeling and mine planning. To maximize mine profitability, planners and schedulers must account for a staggering array of variables and create accurate mining plans that meet production and profit targets. Not surprisingly, this can be a difficult task, and getting it wrong can result in large unforeseen costs and significant lost revenue opportunities. This paper discusses the top five challenges geologists and engineers are facing in developing mining plans.
机译:今天的矿业公司正在增加压力,以提高现有地雷的产量,并迅速带来新的项目。操作的长期绩效的基本是地质建模和矿山规划。为了最大限度地提高矿井盈利能力,规划者和调度人员必须考虑一个惊人的变量阵列,并创造满足生产和利润目标的准确采矿计划。毫不奇怪,这可能是一项艰巨的任务,并弄错了可能导致大量的不可预见的成本和显着的收入机会。本文讨论了地质学家和工程师在开发采矿计划方面面临的五大挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号