首页> 外文会议>International Conference on Energy, Environment and Sustainable Development >Hydrodynamic simulation of WeiYi Bridge in LiuZhou city, Guangxi province, China
【24h】

Hydrodynamic simulation of WeiYi Bridge in LiuZhou city, Guangxi province, China

机译:hydrodynamic simulation of Wei Y i bridge INL IU Zhou city, GU案G系province, China

获取原文

摘要

Liuzhou is an important city of flood protection in china.Flood protection assessment for any new relational-water project is prerequisite.In order to understand the impact to river flow,a 2-D hydrodynamic model is set up,and use ADI method to solute partial differential groups.The results can be shown as fellows: Computation is fast steady and convergent by ADI method,and associated errors of model control is satisfied.The bridge pier has major impacts on river flow. Velocity change due to bridge built could lead to riverbed erosion between piers,and siltation along the upstream and downstream of the Weiyi bridge.Water level could be rised in the bridge upstream with the raised water level of about 0.08m,which might affect drained floods to a some degree.
机译:柳州是中国洪水保护的重要城市。对任何新的关系项目的保护评估是先验的。为了了解对河流的影响,建立了2-D流体动力学模型,并使用ADI方法来溶质部分差分组。结果可以显示为研究员:使用ADI方法计算快速稳定和收敛,满足模型控制的相关误差。桥墩对河流具有重大影响。由于桥梁由于桥梁的速度变化可能导致码头之间的河床侵蚀,沿着魏义桥的上游和下游的淤积。水平可以在上游的桥梁上升,凸起的水位约为0.08米,这可能会影响排水洪水一定程度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号