首页> 外文会议>International Conference on Energy, Environment and Sustainable Development >The Pilot-scale Study of Constructed Intensified Biological Bed on the Purification of Northern Transboundary Polluted River Water
【24h】

The Pilot-scale Study of Constructed Intensified Biological Bed on the Purification of Northern Transboundary Polluted River Water

机译:北跨界污染河水净化构建增强生物床的试验规模研究

获取原文

摘要

Constructed Intensified Biological Bed (CIBB) is a new sewage disposal technology based on subsurface flow constructed wetland and biological aerated filter. The CIBB was applied for serious polluted transboundary river water. The removal rates of pilot scale CIBB on simulated Tiaozi River system COD_(cr), NH3-N and TN were over 70%, 90%, 60% respectively. The hydraulic loading of CIBB reached 4.8m-d"1, and COD_(cr) organic loading was 185g-(m~3d)~(-1) and the ammonium loading was 19 g-(m~3d)~(-1). If the CIBB is used on the Tiaozi River, COD_(cr) and ammonium in outflow of CIBB system will reach class V standards of Environmental quality standard for surface water (GB3838-2002).
机译:建造的强化生物床(CIBB)是一种基于地下流量的新的污水处理技术,构造的湿地和生物曝气过滤器。 CIBB适用于严重污染的越境河水。模拟Tiaozi河系统COD_(CR),NH3-N和TN上的试验秤CIBB的去除率分别为70%,90%,60%。 CIBB的液压加载达到4.8MD“1,COD_(CR)有机负荷为185g-(m〜3D)〜(-1),铵载荷为19g-(m〜3d)〜(-1)。如果CIBB用于Tiaozi河,CIBB系统流出中的COD_(CR)和铵将达到地表水的环境质量标准的V类标准(GB3838-2002)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号