首页> 外文会议>International Conference on Energy, Environment and Sustainable Development >Study on the Main Electrical Connection Optimization of Smart Substation Based on Coordination Between Power Grid and Substation
【24h】

Study on the Main Electrical Connection Optimization of Smart Substation Based on Coordination Between Power Grid and Substation

机译:基于电网与变电站协调的智能变电站主电气连接优化研究

获取原文

摘要

With the construction of smart grid and smart substation, influences of the main electrical connection on the reliability of the entire power gird have become more and more important. Therefore, coordinated development between power grid and substation is a key to the design and optimization of main electrical connection. In this paper, the entire equipment in power grid including the main electrical connection is simulated simultaneously, and then the index of power gird with the main electrical connection optimization by disconnecting circuit breaker is calculated. Optimization schemes are sorted by the method of TOPSIS, realizing the evaluation of main electrical connection based on coordinated development between power grid and substation.
机译:随着智能电网和智能变电站的构造,主要电气连接对整个电源曲线的可靠性的影响变得越来越重要。因此,电网与变电站之间的协调发展是主要电气连接的设计和优化的关键。在本文中,同时模拟包括主电连接的电网中的整个设备,然后计算通过断开断路器具有主电连接优化的电源曲线指数。优化方案是通过TopSIS的方法对的,实现了基于电网与变电站之间的协调开发的主要电气连接的评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号