首页> 外文会议>Brazilian Symposium on Iron Ore >ON THE CONTROLLED CHARGING OF BLAST FURNACES
【24h】

ON THE CONTROLLED CHARGING OF BLAST FURNACES

机译:关于高炉的控制充电

获取原文

摘要

The demands technology of charging blast furnace can be met while fulfilling three prerequisites. Number one, the charging device must be capable of achieving a high degree of circular uniformity in distributing burden material and a flexible control of ore/coke rations along the furnace top radius. Number two: the charging device must be equipped with means to monitor the charging technology on-line. And number three - ACS must support the optimum distribution of ore/coke rations along the furnace radius, using feedback of furnace performance data. The above-said prerequisites have been partially put into effect and are still under development on blast furnace N° 2 at JSPL Steel plant of Jindal Corporation in India. This furnace is Equipped with the bell-less rotary charging unit (BRCU). Nowadays the installation of automatic system called "TOTEM Top Scan" for monitoring the charging process is under implementation.
机译:可以满足充电高炉的需求技术,同时满足三个先决条件。第一,充电装置必须能够在分配负荷材料和沿炉顶半径的矿石/焦炭口口的灵活控制方面实现高度的圆形均匀性。二号:充电装置必须配备手段,以便在线监控充电技术。使用炉子性能数据的反馈,第三种 - ACS必须支持沿着炉径的最佳分布,沿炉径沿炉径。上述说法已经部分地生效,并且在印度的金达尔公司JSPL钢铁厂的高炉N°2上仍在开发。该炉配有响铃旋转充电单元(BRCU)。如今,安装了称为“图腾最高扫描”的自动系统,用于监控充电过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号