首页> 外文会议>ISG*ISARC World Conference >Cost Effective Sensors for Automated Progress Measurement and Management (APMM)
【24h】

Cost Effective Sensors for Automated Progress Measurement and Management (APMM)

机译:用于自动化进度测量和管理(APMM)的经济高效的传感器

获取原文

摘要

Purpose 'Progress' is the most often used indicator in construction project management. Nevertheless, excessive management efforts to collect and analyze detailed data have been highlighted as a major barrier for advanced progress management techniques for construction projects. Even though the advent of data acquisition technologies (DATs) provides for automated manipulation of these requirements, previous research efforts have mainly focused on a specific DAT or on the limited construction tasks. In order to effectively utilize DATs for construction projects, a comprehensive approach is desirable, possibly including every single work item within the automated system. The purpose of this paper is to propose such a methodology for integrated utilization of DATs for repeated applications to multiple work items. Method For the purpose of selecting the most adequate DATs for the most frequent patterns of automated data acquisition methods, we first evaluated a comprehensive evaluation of entire work items for a case-project. The criteria for this selection process are modified and simplified based on the algorithm developed by Kang and Jung. Secondly, DAT candidates for most frequent data acquisition patterns were then systematically examined in order to maximize the benefits of utilizing DATs for construction progress measurement. Results & Discussion We found that the most promising area for automated progress measurement and management (APMM) is to deploy 'simplified and low-cost sensors' for monitoring the 'entrance and exit' of 'labors' into a locator of 'floor (story)' level for a building construction. The rationale, techniques, and implications of the proposed methodology are illustrated by a case-project. Recommendations for future research are also discussed.
机译:目的“进步”是建设项目管理中最常用的指标。然而,已经突出了收集和分析详细数据的过度管理努力作为建筑项目的先进进展管理技术的主要障碍。尽管数据采集技术(DATS)的出现提供了这些要求的自动控制,但之前的研究工作主要集中在特定的日期或有限的施工任务上。为了有效地利用建筑项目的DAT,可以理想的方法,可能包括自动化系统内的每一件单个工作项。本文的目的是提出为多个工作项目的重复应用程序集成利用DAT的方法。为了选择最常见的自动化数据采集方法模式的最适项DAT的方法,我们首先评估了案例项目的整个工作项目的全面评估。基于由康和钟开发的算法进行修改和简化该选择过程的标准。其次,然后系统地检查最常用的数据采集模式的DAT候选,以最大限度地利用用于施工进度测量的日期的益处。结果与讨论,我们发现自动化进展测量和管理(APMM)最有希望的区域是部署“简化和低成本的传感器”,用于监控“劳动力”的“劳动力”到“地板的定位器”(故事建筑施工的水平。案例项目说明了所提出的方法的基本原理,技术和含义。还讨论了未来研究的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号